Ikeja Electrical Plc, on Wednesday, mentioned the disruption of energy provide was because of ongoing upkeep work on Nigeria Fuel Firm (NGC) gasoline pipeline supplying gasoline to Egbin Energy Era Firm.
In a press release issued on its X social media deal with, the electrical energy distribution firm mentioned the continued upkeep had led to short-term shutdown of the plant, leading to load shedding nationwide.
There have been energy outages nationwide previously weeks because of the collapse of the nationwide grid. The disaster turned exacerbated attributable to massive scale theft of energy infrastructure, in accordance with a BusinessDay report.
In its assertion, the facility distribution firm apologized and warranted that normalcy could be restored as quickly as the upkeep work is accomplished.
“We sincerely apologize for any inconvenience attributable to this case and guarantee you that normalcy can be restored upon the completion of the upkeep work,” Ikeja Electrical mentioned within the assertion.